Empowering Barnstable's Watershed Protection Through Resilient Sewer Infrastructure

Long Pond Sewer Expansion

Barnstable, Massachusetts 

The Long Pond Sewer Expansion Project is a key Phase I project under the Town of Barnstable’s Comprehensive Wastewater Management Plan (CWMP), developed to expand sewer infrastructure, improve water quality, and support the Town’s long-term wastewater management goals. Reliance on septic systems within the watershed has contributed to nutrient loading, algal growth, and bacteria impacts in local ponds and lakes, threatening sensitive environmental resources. These impacts threaten the environment and tourism; a sector critical to Barnstable’s economy and its identity as one of Cape Cod’s largest and most prominent towns. This project called for careful design evaluation, thorough site investigation, and sound engineering to support long-term system performance. The Town engaged ECT to provide comprehensive engineering services from preliminary design through construction-ready documents to support this critical infrastructure project.

The project scope centers on evaluating and refining the Town’s conceptual sewer design, including siting pump stations in optimal and resilient locations, and managing supplemental surveying and geotechnical investigations. Preliminary and final design covers approximately 9.1 miles of a new gravity and low-pressure sewer system, along with two new pump stations and associated force mains, drainage improvements, and utility relocations. Beyond design, the work encompasses permitting and regulatory coordination, cost estimating, schedule development, and support with State Revolving Fund (SRF) requirements and other grant funding applications.

Client / Owner

Town of Barnstable

Project Timeline

2025 to Present

Highlights

  • Sewer collection system design
  • Pump station siting and design
  • Geotechnical investigation and survey
  • Permitting and regulatory coordination
  • SRF and grant funding assistance
  • Bidding assistance

ECT Inquiry

KP Test Form

File Upload Section
You may upload up to a total of 10 MB for all of your files; if you need to upload more, please let us know and we will contact you directly.
You may include up to 3 files per upload button. Hold down the command key to select multiple files from the same folder.

KP Test Form

File Upload Section
You may upload up to a total of 10 MB for all of your files; if you need to upload more, please let us know and we will contact you directly.
You may include up to 3 files per upload button. Hold down the command key to select multiple files from the same folder.

ECT Inquiry